Previous Projects
Aspiring Enliven Care Centre Wanaka Installation
IMS was contracted by Spark Energy, a leading supplier of wood heating, processing and handling solutions. This involved the installation of a new 200 kW ETA automated wood chip boiler, automated feed system, primary heating circuit and accumulators.
PGG Wrightsons New Husker Install
IMS installed a new 12 lane husker. We fabricated all the other conveyors and parts to go along with the already existing sorting lines for seed maize.
Cedenco Hawkes Bay Relocation
IMS was contracted to relocate an existing IQF freezing plant from Hawkes Bay to their main factory in Gisborne. This involved decommissioning of the the existing switchboard and control panel and upgrading for installation. The Sabroe compressor was overhauled along with the liquid pump, new and existing pipework to the freezer tunnel, and a complete overhaul of the tunnel itself.
EDI Downer Quarry Upgrade
IMS was contracted by EDI Downer and Mimico for the upgrade of the Waerenga-o-kuri quarry, this consisted of a new switchboard control room, transformer & electrical upgrade. A new NP113 impactor was installed with upgrades to the infeed bin, plate feeder, grizzly, product screen, and associated conveyors.
LeaderBrand Salad House
IMS was given the oppourtunity to tender for the electrical content of the new salad house food processing plant in Gisborne. Our tender was accepted and work began in 2016.